Mar 28, 2014· This work method statement covers the clearing works at (your project name). SCOPE. This method statement shall apply for site clearing work in (the affected area) as per bill of quantities where it require to cut and uprooting the trees, clearing of bushes and cut the trees on the slope area. REFERENCES
The statement will outline the Personal Protective Equipment (PPE) needed for this work. It details the work associated with the installation and raising of sewer pit covers, storm water pit covers and water valve covers. You can use the statement as a reference in case of an emergency as appropriate procedures are included in the statement.
It is important to know that most pit bulltype dogs with responsible owners are not dangerous dogs. In fact, many are affectionate companions. However, if you choose to adopt a dog with an unknown history (whether it is a pit bull type or not), the dog should have temperament testing done first.
installation contractor to produce a Safe Work Method Statement; we recommend that this statement complies with relevant codes of practice, standards and safety regulations. Personnel should follow any safety advice provided by the main contractor/installation contractor when on a nonHumes site. The precast concrete component should only be lifted
Warranty Statement. Home Warranty Statement. Warranty Statement. Product Warranty: General. All products sold by BBQ Pits by Klose, Inc are warranted against defects in workmanship for a period of One (1) year from the date of shipment. If you believe any Klose product you have purchased has a defect in workmanship.
Mar 17, 2013· Method Statement for Drainage Work. March 17, 2013, safetyadmin, ... Work Method: The new drain positions will be set out by competent person. Levels of existing connection points will be checked (if required) A trench will be excavated alone the line of the new pipe, level control by pipe laser or manual level. ...
Method Statement for Construction of Water, Stormwater and Sewer Pipelines 1. Introduction This technical note covers the generic design and construction considerations and parameters for the laying of pipelines for the Westfield Estate. The proposed pipelines range in size from 1 500mm to 75mm nominal diameter. All pipes will be
Western Power Safe Work Method Statement – Internal Inspection of Power Transformers page 4 of 26. Job Steps required to perform the job, in the correct sequence Hazards for each job step Initial Risk Rating Controls Controlled References required to eliminate or minimise the risk of injury Risk
Sep 08, 2017· Wok Method statement for Excavation and Backfilling SCOPE : Covers clearing of area, excavation, backfilling, grading and testing. ... Excavation pit shall be kept free from water by suitable means of dewatering as and when required ; ... Column construction work method statement. AntiStatic Epoxy Flooring – Method and Application.
SETTING OUT WORKS METHOD STATEMENT 1 MATERIALS EQUIPMENTS Type of materials 1st delivery date** Type of equipments Quantity Tripod 3 Theodolite 1 Hammer 2 Prism 2 Peg 20 Measuring Tape 1 Nail 30 Total Station (EDM) 1 Plumb bob 2 2 WORK METHOD STATEMENT The attached Work Method Statement shall include the following : Flow Chart Remark No ...
METHOD STATEMENT AND RISK ASSESSMENT Duplex Cleaning Machines are committed to achieving excellence in safety management All work will be conducted in accordance with ...
Safe work method statements. Safe work method statements are required for all high risk construction work, including any construction work that: involves a risk of a person falling 2 metres or more; is carried out in or near a shaft or trench with an excavated depth .
Jul 30, 2015· Even abbreviated to "SWMS", it's a mouthful. Safe Work Method Statements are a central component of any worksite's occupational health and safety (OHS) system. Still, many builders and contractors fail to insist on them from their subcontractors. Last April, we published an article on what an SWMS was and why it was important.
The Safe Work Method Statements module is where each step of a task, potential hazard, risks and controls can be listed. Potential hazards, risks and controls can be recorded against the tasks identified. Within this module hazards and corrective actions can be created, describing how the identified risks will be controlled and what control ...
Having an excavation method statement (as compared to other method statements for other jobs) is particularly important, since excavations often present particularly hazardous conditions for workers involved in them, such as the everpresent risk of caveins. Additionally, it is the law in many areas that an excavation method statement be ...
Sep 07, 2012· method statement for dynamic load test and pile driving analysis test DYNAMIC PILE TESTING EQUIPMENT D ynamic pile testing and instrumentation will be performed using the PDA/CAPWAP system on the tested pile.